On October 29-30th, a large section of the copper facade on the front of the building broke away from the roof during the heavy wind/rain storms we had over the Halloween weekend. Maintenance noticed it was loose, and pulled the loose section up onto the roof, securing it so that it would not blow away or fall to the into the street. One of the copper downspouts at the back of the building was also damaged. Markwood is in the process of making arrangements to have these repaired as quickly as possible.
Friday, November 3, 2017
Facade Damage/ Roof Repairs
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment