The missing lower parts of the building downspouts on the driveway side were recently replaced. This should alleviate some of the puddling and leaking that were happening on the basement level.
Scaffolding is scheduled to be delivered by the end of the week for the front façade refurbishment, per the Master Insurance Claim. This may cause some inconvenience for sidewalk traffic in front of the building, and tenants living in the front units should be aware that scaffolding and workmen may be directly outside their windows while the repairs are being done.