After spending several months searching for and successfully plugging leaks around the roof access doorway, the maintenance crew has begun patching the walls in the back stairway. Anyone who is familiar with the large sections of peeling paint and damaged plaster that filled the walls of the back stairwell after the flooding rains of two years ago should appreciate this. This is just in time for the scheduled painting of the entire building interior.
This should greatly improve the overall look of the entire interior.
Showing posts with label painting. Show all posts
Showing posts with label painting. Show all posts
Wednesday, December 12, 2012
Subscribe to:
Posts (Atom)
